How to compare quotations from self-employed carpenters in the Netherlands
An hourly rate tells you only part of what an installation will cost. Compare two example door-fitting quotes and use the same approach for your own request.
HR Kamer ·
Give both carpenters the same brief
Include the number and sizes of the doors, condition of the frames, type of hinges and address. Say whether the doors have been delivered, who takes away the old leaves and whether any timber needs repair. Include a photo of a hinge and an opening. Both contractors can then give a price for the same set of tasks, including hanging, adjustment and disposal if you need them.
Compare the total with travel included
Carpenter A expects 16 hours at €45 plus €90 for travel. That comes to €810 excluding VAT. Carpenter B estimates 18 hours at €43 plus €60 in travel costs, totalling €834 excluding VAT. If everything else is equal, the difference is €24. If B also takes away the old doors, ask what disposal would cost with A before deciding which quote suits you.
Agree how to approve extra work
A damaged frame can become visible only after the old door comes off. Before work begins, agree who receives a photo, the estimated cost and the additional time needed. If paying by the hour, decide who approves the hours worked. If accepting a fixed sum, record which changes to the scope must be approved separately. That gives the carpenter someone to call while the opening is exposed.
Check the details before accepting
Check the contractor’s name, work address, dates, materials, VAT treatment and payment basis. Set a point when you will check the doors together and record any adjustments still needed. You could reply, “I accept the fitting work described. Please quote separately for any frame repairs discovered during removal.” The Dutch Chamber of Commerce also publishes guidance on what to include in a clear quotation.
A short quote comparison you can reuse
Send both contractors the same questions. “Attached are the sizes and photographs. Please list labour, estimated hours, number of trips, hardware and disposal separately. Does fitting include final adjustment and minor fixes at handover? Is the total a fixed price or an estimate, how long is it valid and when could you fit the doors?”
When a contractor leaves a line blank, mark it “to agree” in your comparison. Entering a zero for a missing price makes an incomplete quote look cheaper. Request a figure for any missing item that could change which proposal you choose.
Looking for a freelance carpenter?
Register your company to post an assignmentFind freelance carpentersAre you a freelance carpenter?
Create your carpenter profileSelect ZZP assignments in the form and enter your trade.
Browse carpentry assignments
English
Nederlands
Polski